Construction and installation subcontract (2) model text

both parties to the contract:

, hereinafter referred to as the main contractor:, hereinafter referred to as the subcontractor

both parties have jointly completed the construction and installation tasks of the project in the spirit of division of labor and cooperation. This contract is hereby concluded after full negotiation

Article 1 project name

. (refers to the project name of the subcontracting department that the company originally planned to raise and invest 12000 tons of continuous polymerization differentiated spandex fiber in 2012)

Article 2 project location

Article 3 scope of work

. (the method of listing the attached table can be used)

Article 4 quality standard

. (it can be listed in accordance with the project construction details, construction instructions and the technical specifications for construction acceptance of installation engineering)

Article 5 contracting method

(if the labor and materials are contracted according to the budget, the materials that are the responsibility of the general contractor and the employer shall be specified by the subcontractor with attached tables)

Article 6 total price of the project

the package price of the project is RMB only

Article 7 project package price

the project package price is RMB only (the total cost of the project minus the employer's 10. Batch test: after setting one test with the same parameters, one batch of sample tests can be completed in sequence; and the total value of materials supplied by the general contractor)

Article VIII payment method

Article IX project period

according to the scope of work specified in Article III of the contract, the project shall be started from mm/DD/yyyy to completed on mm/DD/yyyy

Article 10 intermediate handover

the project within the scope of the project shall be commenced on mm/DD/yyyy, commenced on mm/DD/yyyy, and completed on mm/DD/yyyy

Article 11 contact system and cooperation measures of both parties

Article 12 project confidentiality measures

Article 13 breach of contract

Article 14 special provisions

Article 15 term of validity of the contract: the contract shall take effect immediately after being signed and sealed by both parties, and shall become invalid after the completion of the whole project and the settlement of the handover and acceptance funds

Article 16 number of copies of the contract: two copies of the formal contract, one for each party, copies, and

copies received by the main contractor (one for each of the appropriation bank and the employer); The subcontractor shall receive copies of

Article 17 Contract Appendix

main contractor:

principal:

address:

subcontractor:

principal:

address::

signed on mm/DD/yyyy

Schedule 1: list of Engineering projects┬-- ┬-- ┬-- ┬-- -- -- │

│ project budget No. │ project name │ unit │ project quantity │ budget │ value │ scheduled construction period │ remarks │

│ │ │ │ │ (budget estimate) │ commencement As built │ │

ⅶ--┼--┼--┼┼┼--┼--┼--┼┼--┼ⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶⅶ Environmental protection and product quality should be comprehensively considered │ │

│ │ │ │ │

│ │ │ │ │ │

│ │ │ │ │ │ │

└ -- ┴ -- ┴ -- ┴ -- ┴ -- ┴ -- ┴ -- ┴ -- ┴ -- ┴ -- ┴ -- ┴ --┘

Schedule 2: main contractor (employer) Responsible for the supply of material list

┌ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - │ │ │ │ │ │

│ │ │ │ │ │ │ │

│ │ │ │ │ │ │ │

│ │ │ │ │ │ │ │

└────┴────┴────┴────┴────┴────┴────┘